Arisha Private Economic Zone Ltd

The proposed Aarisha Economic Zone in Basila is about 5KM from National Parliament in the capital city of Dhaka and has a bright future ahead. There will be approximately 150 manufacturing units along with all the necessary modern services required. With a dream of streamlined investment solution, the EZ plans to be set up with modern technology and infrastructural support, enabling the investors of the…

Dhaka West Power Ltd

This will be the third power plant of Maisha Group and is expected to be operational by 2018.This would be an IPP basis Power Plant . This   plant will be connected to the national grid through Aminbazar Substation also. The main Generating  set will be supplied by MAN Diesel & Turbo. Balance of Plant materials will be supplied by different reputed company  from Europe .…

Dhaka North Power Utility Co. Ltd

A 108 MW HFO Fired Private Power Plant at Bosila, Washpur, Keraniganj  was awarded by BPDB under Ministry of Power. The subsequent PPA was signed with BPDB and IA with Ministry under Build, Own, Operate (BOO) basis . This plant is being built adjacent to CLC  plant and also will be connected to the national grid through Aminbazar Substation in 2017. The main Generating set…

CLC Power Company Ltd

A 108 MW HFO Fired Power Plant at  Washpur, Keraniganj . The PPA was signed with BPDB and IA with Ministry of Power on December 05, 2011 under Build, Own, Operate (BOO). This is the nearest power plant of Capital Dhaka, connected to the national grid through Aminbazar Substation. The plant has achieved its Commercial Operation declaration on a declared capacity of 108 MW. The…